HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek


Newfield Avenue Bridge
HSRNational HSR. Local HSR.

Rough Distance: 0 Miles (0 Kilometers)

Click to visit page.
Newfield Avenue Over Merritt Parkway (CT-15) in Stamford: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 71 ft. Main Span: 62 ft. Roadway: 30.2 ft. Main Spans: 1
Built 1937 By: Mariani Construction Company of New Haven, Connecticut
Ponus Ridge Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 1.1 Miles (1.8 Kilometers)

Click to visit page.
Ponus Ridge Road Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 73 ft. Main Span: 59 ft. Roadway: 30.2 ft. Main Spans: 1
Built 1937 By: Mariani Construction Company of New Haven, Connecticut
Wire Mill Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 1.6 Miles (2.6 Kilometers)

Click to visit page.
Wire Mill Road Over Merritt Parkway (CT-15) in Stamford: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 76 ft. Main Span: 67 ft. Roadway: 30.2 ft. Main Spans: 1
Built 1938 By: Paul Bacco Construction Company of Stamford, Connecticut
Long Ridge Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 2.1 Miles (3.4 Kilometers)

Click to visit page.
Merritt Parkway (CT-15) Over Long Ridge Road (CT-104) in Stamford: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 58 ft. Main Span: 52 ft. Roadway: 60 ft. Main Spans: 1
Built 1936 By: Paul Bacco Construction Company of Stamford, Connecticut
Metro North Bridge
New York, New Haven and Harford Railroad Bridge
HSRNational HSR. Local HSR.

Rough Distance: 2.3 Miles (3.7 Kilometers)

Click to visit page.
Railroad (Metro North) Over Merritt Parkway (CT-15) in Talmadge Hill: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 77 ft. Main Span: 32 ft. Roadway: 16 ft. Main Spans: 2
Built 1937 By: Paul Bacco Construction Company of Stamford, Connecticut
Lapham Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 2.6 Miles (4.1 Kilometers)

Click to visit page.
Lapham Road Over Merritt Parkway (CT-15) in New Canaan: Fairfield County, Connecticut, United States
Non-Historic, Fixed
Length: 73 ft. Main Span: 62 ft. Roadway: 30 ft. Main Spans: 1
Built 1937 By: Unknown
South Avenue Bridge
HSRNational HSR. Local HSR.

Rough Distance: 3.2 Miles (5.2 Kilometers)

Click to visit page.
South Avenue (CT-124) Over Merritt Parkway (CT-15) in New Canaan: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 79 ft. Main Span: 68 ft. Roadway: 45 ft. Main Spans: 1
Built 1937 By: Daniel Deering Construction Company of Norwalk, Connecticut
Guinea Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 3.7 Miles (5.9 Kilometers)

Click to visit page.
Guinea Road Over Merritt Parkway (CT-15) in Stamford: Fairfield County, Connecticut, United States
Concrete Closed Spandrel Deck Arch, Fixed
Length: 100 ft. Main Span: 80 ft. Roadway: 31.5 ft. Main Spans: 1
Built 1937 By: Paul Bacco Construction Company of Stamford, Connecticut
White Oak Shade Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 3.8 Miles (6.2 Kilometers)

Click to visit page.
White Oak Shade Road Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 78 ft. Main Span: 68 ft. Roadway: 30 ft. Main Spans: 1
Built 1938 By: M. A. Gammino Construction Company of Providence, Rhode Island
Main Street Bridge
HSRNational HSR. Local HSR.

Rough Distance: 4 Miles (6.5 Kilometers)

Click to visit page.
Main Street Over Rippowam River in Stamford: Fairfield County, Connecticut, United States
Metal 5 Panel Pin-Connected Lenticular Through Truss, Fixed
Length: 123 ft. Main Span: 61 ft. Roadway: 33.8 ft. Main Spans: 2
Built 1888 By: Berlin Iron Bridge Company of East Berlin, Connecticut
Marvin Ridge Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 4.3 Miles (6.8 Kilometers)

Click to visit page.
Marvin Ridge Road Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Non-Historic, Fixed
Length: 73 ft. Main Span: 67 ft. Roadway: 30 ft. Main Spans: 1
Built 1937 By: Unknown
Riverside Avenue Bridge
HSRNational HSR. Local HSR.

Rough Distance: 6.2 Miles (10 Kilometers)

Click to visit page.
Riverside Avenue Over Railroad (Metro-North) in Riverside: Fairfield County, Connecticut, United States
Metal (Cast Iron) 15 Panel Pin-Connected Whipple (Double-Intersection Pratt) Through Truss, Fixed
Length: 171 ft. Main Span: 164 ft. Roadway: 20.7 ft. Main Spans: 1
Built 1871 By: Keystone Bridge Company of Pittsburgh, Pennsylvania
West Rocks Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 7.5 Miles (12.1 Kilometers)

Click to visit page.
West Rocks Road Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Metal Rigid-Frame, Fixed
Length: 90 ft. Main Span: 75 ft. Roadway: 27.6 ft. Main Spans: 1
Built 1938 By: Paul Bacco Construction Company of Stamford, Connecticut
East Rocks Road Bridge
HSRNational HSR. Local HSR.

Rough Distance: 8 Miles (12.8 Kilometers)

Click to visit page.
East Rocks Road Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 79 ft. Main Span: 72 ft. Roadway: 26.6 ft. Main Spans: 1
Built 1938 By: Mariani Construction Company of New Haven, Connecticut
Grumman Avenue Bridge
HSRNational HSR. Local HSR.

Rough Distance: 8.5 Miles (13.6 Kilometers)

Click to visit page.
Grumman Avenue Over Merritt Parkway (CT-15) in Norwalk: Fairfield County, Connecticut, United States
Concrete Rigid-Frame, Fixed
Length: 69 ft. Main Span: 63 ft. Roadway: 30 ft. Main Spans: 1
Built 1938 By: New Haven Construction Company of New Haven, Connecticut
Newtown Turnpike Bridge
HSRNational HSR. Local HSR.

Rough Distance: 9.9 Miles (15.9 Kilometers)

Click to visit page.
Newtown Turnpike Over Merritt Parkway (CT-15) in Westport: Fairfield County, Connecticut, United States
Concrete Closed Spandrel Deck Arch, Fixed
Length: 115 ft. Main Span: 45 ft. Roadway: 41 ft. Main Spans: 2
Built 1939 By: Louis J. Bacco Construction Company of Stamford, Connecticut

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider