Railroad (Canadian Pacific) Over Seguin River, Railroad (Fitness Trail Rail-Trail), and Various Streets in Parry Sound: Parry Sound District, Ontario, Canada
Metal 7 Panel Rivet-Connected Pratt Deck Truss, Fixed and Approach Spans: Metal 12 Panel Rivet-Connected Warren Deck Truss,
Length: 1,697 ft.
Main Span: 165 ft.
Main Spans: 2
Built 1908
By: Hamilton Bridge Company of Hamilton, Ontario
Special Bridge Conditions Legend:R - Former location of relocated bridge. ! - At risk for demolition or destruction.
X - Confirmed demolished or
collapsed. S
- Dismantled and/or in storage. L -
Severe loss of historic integrity due to alteration.