HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek


Outlook Bridge
Big Orange Bridge
HSRNational HSR. Local HSR.

Rough Distance: 0 Miles (0 Kilometers)

Click to visit page.
SK-15 (Abandoned Alignment) Over South Saskatchewan River in Outlook: Division 11 (Saskatoon), Saskatchewan, Canada
Metal 9 Panel Rivet-Connected Parker Through Truss, Fixed
Length: 1,154 ft. Main Span: 219 ft. Main Spans: 5
Built 1936 By: Bird, Woodall and Simpson, of Regina, Saskatchewan
!
Outlook Railway Bridge
Skytrail Pedestrian Bridge
HSRNational HSR. Local HSR.

Rough Distance: 1 Miles (1.6 Kilometers)

Click to visit page.
Railroad (Rail-Trail) (Former Canadian Pacific) Over South Saskatchewan River in Outlook: Division 11 (Saskatoon), Saskatchewan, Canada
Metal 12 Panel Pin-Connected Whipple (Double-Intersection Pratt) Deck Truss, Fixed and Approach Spans: Metal Deck Girder, Fixed
Length: 3,004 ft. Main Span: 242 ft. Main Spans: 8
Built 1887 By: Dominion Bridge Company of Montréal, Québec and C. Schaler Smith

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider