Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.6 m = 24.9 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 7.4 m = 24.3 ft (2 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 6.5 m = 21.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Honolulu [17000]: Honolulu County [003], Hawaii [15]
Owned by County Highway Agency [02], DOT District: 25
TMK=3-4-03
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 16.2 metric ton = 17.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 12.6 metric ton = 13.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 400 (2009) and Trucks: 0%
Future ADT: 500 (In 2029
)