Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 1500.8 m = 4924.1 ft
Main Spans: 37 at 41.1 m = 134.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.9 m = 35.8 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 19.9 m = 65.3 ft
Location
Unknown [00000]: Monroe County [087], Florida [12]
Owned by State Highway Agency [01], DOT District: 6
FIESTA-CRAIG KEY (MM 71)
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 23.2 metric ton = 25.5 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 7.2 metric ton = 7.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 11500 (2020) and Trucks: 12%
Future ADT: 19952 (In 2040
)