Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.3 m = 20.7 ft
Main Spans: 2 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (3 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Davie [16475]: Broward County [011], Florida [12]
Owned by City or Municipal Highway Agency [04], DOT District: 4
ORANGE DR AT SW 76TH AVE.
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 57.9 metric ton = 63.7 tons (Load Factor(LF) [1])
Inventory: 34.7 metric ton = 38.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3000 (2019) and Trucks: 2%
Future ADT: 4000 (In 2041
)