Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 30.2 m = 99.1 ft
Main Spans: 5 at 5.9 m = 19.4 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.7 m = 48.2 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Tampa [71000]: Hillsborough County [057], Florida [12]
Owned by City or Municipal Highway Agency [04], DOT District: 7
0.7 MILE S OF DAVIS BLVD.
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 71.5 metric ton = 78.7 tons (Load Factor(LF) [1])
Inventory: 42.9 metric ton = 47.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2600 (2017) and Trucks: 5%
Future ADT: 3120 (In 2039
)