HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


OVERBROOK AVENUE over STEVENSON CREEK (Route: 0)
Num:155509x
Posted for other load-capacity restriction [R]
Built: 1926, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.2 m = 20.3 ft
Main Spans: 1 at 6.2 m = 20.3 ft
Approach Spans: 0
Skew: 49
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Clearwater [12875]: Pinellas County [103], Florida [12]
Owned by City or Municipal Highway Agency [04], DOT District: 7
0.2MI S OF SUNSET PT. RD
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 13.5 / H 15 [2]
Operating: 40.9 metric ton = 45.0 tons (Load Factor(LF) [1])
Inventory: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 500 (2021) and Trucks: 5%
Future ADT: 868 (In 2042 )
DOUGLAS AVE. over STEVENSON CREEK (Route: 0)
Num:155503x
Posted for other load-capacity restriction [R]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 41 m = 134.5 ft
Main Spans: 3 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.6 m = 44.6 ft (3 Lanes) and Out-To-Out: 16 m = 52.5 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Clearwater [12875]: Pinellas County [103], Florida [12]
Owned by City or Municipal Highway Agency [04], DOT District: 7
0.5 MILE SOUTH OF CR-576
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 44.5 metric ton = 49.0 tons (Load Factor(LF) [1])
Inventory: 19.9 metric ton = 21.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4900 (2019) and Trucks: 3%
Future ADT: 8502 (In 2041 )
SUNSET PT RD/CR576 over SPRING BRANCH CREEK (Route: 576)
Num:154568x
Open: no restriction [A]
Built: 2020, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 6.6 m = 21.7 ft
Main Spans: 2 at 3.3 m = 10.8 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 13.2 m = 43.3 ft approaching roadway.
Vertical Clearance: 30.45 m = 99.9 ft and Navigational Clearance: 0 = N/A
Location
Clearwater [12875]: Pinellas County [103], Florida [12]
Owned by County Highway Agency [02], DOT District: 7
0.2MI EAST OF DOUGLAS AVE
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: HL93 [A]
Operating: 56.8 metric ton = 62.5 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 46.7 metric ton = 51.4 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 7500 (2021) and Trucks: 4%
Future ADT: 9000 (In 2041 )
ALT US-19 SR-595 over STEVENSON'S CREEK (Route: 19)
Num:150173x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 35.6 m = 116.8 ft
Main Spans: 3 at 11.8 m = 38.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.4 m = 53.8 ft (3 Lanes) and Out-To-Out: 22.4 m = 73.5 ft for a 16.7 m = 54.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Clearwater [12875]: Pinellas County [103], Florida [12]
Owned by State Highway Agency [01], DOT District: 7
1.6 MILE N OF SR-590
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.8 metric ton = 66.9 tons (Allowable Stress(AS) [2])
Inventory: 45.4 metric ton = 49.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 14900 (2019) and Trucks: 3%
Future ADT: 25852 (In 2041 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider