Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 49.2 m = 161.4 ft
Main Spans: 4 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.4 m = 40.7 ft (4 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 12.4 m = 40.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Tampa [71000]: Hillsborough County [057], Florida [12]
Owned by State Highway Agency [01], DOT District: 7
1.7 MILE NORTH OF US-92
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 30.8 metric ton = 33.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 23.8 metric ton = 26.2 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 19800 (2019) and Trucks: 4%
Future ADT: 34353 (In 2041
)