Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 43.3 m = 142.1 ft
Main Spans: 1 at 18.3 m = 60.0 ft
Approach Spans: 2
Skew: 15
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Liverpool [43120]: Brazoria County [039], Texas [48]
Owned by County Highway Agency [02], DOT District: 12
0.90 MI NE OF CR 203
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 1200 (2011) and Trucks: 2%
Future ADT: 2500 (In 2031
)