HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


US 90 over W FORK SAN FELIPE CREEK (Route: 90)
Num:222330002301001x
Open: no restriction [A]
Built: 1935, Reconstructed: 1998
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 64 m = 210.0 ft
Main Spans: 7 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 24.5 m = 80.4 ft (4 Lanes) and Out-To-Out: 28.8 m = 94.5 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by State Highway Agency [01], DOT District: 22
0.15 MI E OF US 277
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 23210 (2019) and Trucks: 3%
Future ADT: 30020 (In 2036 )
US 90 over E FORK SAN FELIPE CREEK (Route: 90)
Num:222330002301002x
Open: no restriction [A]
Built: 1935, Reconstructed: 1998
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 45.7 m = 149.9 ft
Main Spans: 5 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 24.5 m = 80.4 ft (4 Lanes) and Out-To-Out: 28.8 m = 94.5 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by State Highway Agency [01], DOT District: 22
0.25 MI E OF US 277
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 23210 (2019) and Trucks: 3%
Future ADT: 30020 (In 2036 )
S BEDELL AVE over SAN FELIPE CREEK (Route: 0)
Num:222330B00275003x
Open: no restriction [A]
Built: 2007, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 24.4 m = 80.1 ft
Main Spans: 1 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 22
0.25 MI SE OF US 90
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 580 (2016) and Trucks: 0%
Future ADT: 1150 (In 2033 )
US 277 over SAN FELIPE CREEK (Route: 277)
Num:222330029901041x
Open: no restriction [A]
Built: 1955, Reconstructed: 1985
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 101.8 m = 334.0 ft
Main Spans: 11 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 23.2 m = 76.1 ft (6 Lanes) and Out-To-Out: 28 m = 91.9 ft for a 24.4 m = 80.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by State Highway Agency [01], DOT District: 22
0.25 MI SE OF US 90
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: Other [C]
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 20443 (2019) and Trucks: 3%
Future ADT: 27080 (In 2036 )
US 277 over US 277 SPUR/ UPRR (Route: 277)
Num:222330002309064x
Open: no restriction [A]
Built: 1985, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Slab [01]
Approach Span(s): Prestressed concrete continuous [6] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 79.2 m = 259.9 ft
Main Spans: 2 at 24.4 m = 80.1 ft
Approach Spans: 2
Skew: 9
Width, Roadway: 19.5 m = 64.0 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by State Highway Agency [01], DOT District: 22
0.1 MI S OF US 90
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20443 (2019) and Trucks: 4%
Future ADT: 16340 (In 2033 )
SPRING ST over DRAW (Route: 0)
Num:222330B01350008x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 6.4 m = 21.0 ft
Main Spans: 2 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 7.5 m = 24.6 ft (2 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 22
0.6 MI NE OF PECAN ST
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1950 (2016) and Trucks: 0%
Future ADT: 5800 (In 2033 )
SP 277 (OGDEN ST) over DRAW (Route: 277)
Num:222330029901042x
Open: no restriction [A]
Built: 1955, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.6 m = 24.9 ft
Main Spans: 3 at 2.4 m = 7.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.6 m = 51.2 ft (4 Lanes) and Out-To-Out: 16.2 m = 53.2 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by State Highway Agency [01], DOT District: 22
0.3 MI W OF US 277
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: Other [C]
Operating: 30.6 metric ton = 33.7 tons (Unknown [B])
Inventory: 22.7 metric ton = 25.0 tons (Unknown [B])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5610 (2013) and Trucks: 5%
Future ADT: 7860 (In 2033 )
GILLIS ST over SAN FELIPE CREEK (Route: 0)
Num:222330B00805001x
Open: no restriction [A]
Built: 1935, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 45.7 m = 149.9 ft
Main Spans: 5 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Del Rio [19792]: Val Verde County [465], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 22
0.1 MI NW OF DELAROSA ST
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4233 (2018) and Trucks: 3%
Future ADT: 6701 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider