Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 3 at 2.7 m = 8.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.27 MI W OF ROOSEVELT AV
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons (No rating analysis or evaluation performed [5])
Inventory: 24.5 metric ton = 27.0 tons (No rating analysis or evaluation performed [5])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8940 (2011) and Trucks: 0%
Future ADT: 300 (In 2031
)