HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 20


CASSIANO ST over NOGALITOS ST (Route: 0)
Num:150150B05950001x
Open: no restriction [A]
Built: 1937, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 2
Skew: 28
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.10 MI W OF S FLORES ST
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 45.4 metric ton = 49.9 tons (Allowable Stress(AS) [2])
Inventory: 29 metric ton = 31.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8330 (2011) and Trucks: 0%
Future ADT: 144 (In 2031 )
LA CHAPELLE ST over NOGALITOS ST (Route: 0)
Num:150150B18900001x
Open: no restriction [A]
Built: 1937, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 2
Skew: 28
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.1 MI W OF S FLORES ST
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 520 (2011) and Trucks: 0%
Future ADT: 390 (In 2031 )
CEVALLOS ST over SAN PEDRO CREEK (Route: 0)
Num:150150B06455001x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 29.9 m = 98.1 ft
Main Spans: 2 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.10 MI E OF IH 35
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 53.5 metric ton = 58.9 tons (Allowable Stress(AS) [2])
Inventory: 35.4 metric ton = 38.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9490 (2011) and Trucks: 0%
Future ADT: 8175 (In 2031 )
IH 35 NB ON RAMP over SAN PEDRO CREEK (Route: 35)
Num:150150001710355x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 100.6 m = 330.1 ft
Main Spans: 3 at 33.5 m = 109.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.1 m = 23.3 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.60 MI N OF IH 10
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18270 (2013) and Trucks: 12%
Future ADT: 25580 (In 2033 )
IH 35 NB UP LEVEL over S LAREDO ST TO GUADALUPE (Route: 35)
Num:150150001710340x
Open: no restriction [A]
Built: 1993, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1004 m = 3294.1 ft
Main Spans: 35 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 15.5 m = 50.9 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
DOWNTOWN Y
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 85430 (2017) and Trucks: 12%
Future ADT: 127940 (In 2033 )
NOGALITOS ST over SAN PEDRO CREEK (Route: 0)
Num:150150B24750003x
Open: no restriction [A]
Built: 1959, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 79.9 m = 262.2 ft
Main Spans: 5 at 16.2 m = 53.2 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 12.8 m = 42.0 ft (4 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.20 MI NE OF IH 10
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 32.7 metric ton = 36.0 tons (Unknown [B])
Inventory: 24.5 metric ton = 27.0 tons (Unknown [B])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6889 (2015) and Trucks: 0%
Future ADT: 9720 (In 2031 )
FURNISH AVE over SAN PEDRO CREEK (Route: 35)
Num:150150001710085x
Open: no restriction [A]
Built: 1952, Reconstructed: 1960
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 64.6 m = 212.0 ft
Main Spans: 8 at 9.1 m = 29.9 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 6.22 m = 20.4 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.05 MI W OF IH 35
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1000 (2012) and Trucks: 12%
Future ADT: 117990 (In 2032 )
IH 35 NB over SAN PEDRO CREEK & RR (Route: 35)
Num:150150001710353x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 553.5 m = 1816.0 ft
Main Spans: 23 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 21.3 m = 69.9 ft (5 Lanes) and Out-To-Out: 21.9 m = 71.9 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.55 MI N OF IH 10
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 85430 (2017) and Trucks: 12%
Future ADT: 127940 (In 2033 )
IH 35 SB UP LEVEL over GUADALUPE ST TO S LAREDO (Route: 35)
Num:150150001710339x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1002.5 m = 3289.2 ft
Main Spans: 36 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 11.3 m = 37.1 ft (2 Lanes) and Out-To-Out: 15.6 m = 51.2 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
DOWNTOWN Y
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 91897 (2017) and Trucks: 12%
Future ADT: 127940 (In 2033 )
IH 35 SB over SAN PEDRO CREEK & RR (Route: 35)
Num:150150001710352x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 553.5 m = 1816.0 ft
Main Spans: 16 at 30.5 m = 100.1 ft
Approach Spans: 5
Skew: 99
Width, Roadway: 21.6 m = 70.9 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.55 MI N OF IH 10
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 91897 (2017) and Trucks: 12%
Future ADT: 127940 (In 2033 )
IH 35 over S LAREDO ST (Route: 35)
Num:150150001710082x
Open: no restriction [A]
Built: 1952, Reconstructed: 1991
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 3 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 21.6 m = 70.9 ft (4 Lanes) and Out-To-Out: 23.2 m = 76.1 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.30 MI S OF SP 536
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [B])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [B])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 171936 (2019) and Trucks: 12%
Future ADT: 127940 (In 2033 )
IH 35 SB OFF RAMP over ON-RAMP & SAN PEDRO CRK (Route: 35)
Num:150150001710354x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 329.8 m = 1082.1 ft
Main Spans: 12 at 35.1 m = 115.2 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.1 m = 23.3 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.6 MI N OF IH 10
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 50 (2013) and Trucks: 5%
Future ADT: 70 (In 2033 )
S LAREDO ST over ALAZAN CREEK (Route: 0)
Num:150150B19770006x
Open: no restriction [A]
Built: 2011, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 81.1 m = 266.1 ft
Main Spans: 7 at 11.6 m = 38.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 19.4 m = 63.7 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.05 MI W OF IH 35
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 44.4 metric ton = 48.8 tons (Unknown [C])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [C])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 15743 (2015) and Trucks: 13%
Future ADT: 117510 (In 2031 )
IH 35 NB UL ON RP over R.O.W. N OF W CEVALLOS (Route: 35)
Num:150150001710350x
Open: no restriction [A]
Built: 1991, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 114.9 m = 377.0 ft
Main Spans: 4 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.1 m = 23.3 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.15 MI S OF SP 536
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 50 (2013) and Trucks: 7%
Future ADT: 70 (In 2033 )
IH 35 SB OFF RP over R.O.W. N OF S LAREDO (Route: 35)
Num:150150001710349x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 134.1 m = 440.0 ft
Main Spans: 5 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.1 m = 23.3 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.15 MI S OF SP 536
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 50 (2013) and Trucks: 5%
Future ADT: 70 (In 2033 )
SP 536 (S ALAMO) over SAN PEDRO CREEK (Route: 536)
Num:150150001711079x
Open: no restriction [A]
Built: 1951, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 24.4 m = 80.1 ft
Main Spans: 3 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (4 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
0.10 MI SE OF IH 35
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11750 (2018) and Trucks: 10%
Future ADT: 16460 (In 2038 )
S FLORES ST over SAN PEDRO CREEK (Route: 8016)
Num:150150B12355003x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 80.5 m = 264.1 ft
Main Spans: 6 at 15.4 m = 50.5 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 15.9 m = 52.2 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.2 MI N OF IH 10
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8110 (2011) and Trucks: 0%
Future ADT: 9000 (In 2031 )
CAMP ST over SAN PEDRO CREEK (Route: 0)
Num:150150B05360001x
Open: no restriction [A]
Built: 1934, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 9.4 m = 30.8 ft
Main Spans: 3 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.10 MI E OF IH 35
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1350 (2011) and Trucks: 0%
Future ADT: 1432 (In 2031 )
TAMPICO ST over ALAZAN CREEK (Route: 0)
Num:150150B33685001x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 4 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 15
0.10 MI W OF S MEDINA ST
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 360 (2013) and Trucks: 0%
Future ADT: 727 (In 2033 )
SP 536 (ALAMO ST) over IH 35 LOWER LEVEL (Route: 536)
Num:150150001710080x
Open: no restriction [A]
Built: 1952, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 2 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.3 m = 46.9 ft (4 Lanes) and Out-To-Out: 18.6 m = 61.0 ft for a 14.3 m = 46.9 ft approaching roadway.
Vertical Clearance: 4.83 m = 15.8 ft and Navigational Clearance: 0 = N/A
Location
San Antonio [65000]: Bexar County [029], Texas [48]
Owned by State Highway Agency [01], DOT District: 15
1.4 MI N OF US 90
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11750 (2013) and Trucks: 10%
Future ADT: 16460 (In 2033 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact