HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


OLD KATY RD WB over HEMPSTEAD HWY EB (Route: 0)
Num:121020B35561273x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 45.7 m = 149.9 ft
Main Spans: 3 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Houston [35000]: Harris County [201], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 12
1.2 MI N OF IH 10
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 52.6 metric ton = 57.9 tons (Allowable Stress(AS) [2])
Inventory: 35.4 metric ton = 38.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10000 (2015) and Trucks: 5%
Future ADT: 11400 (In 2035 )
IH10 WB - IH610 NB over IH10 WB EX & OLD KATY EB (Route: 10)
Num:121020027117561x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 646.8 m = 2122.2 ft
Main Spans: 6 at 74.4 m = 244.1 ft
Approach Spans: 11
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Houston [35000]: Harris County [201], Texas [48]
Owned by State Highway Agency [01], DOT District: 12
0.25 MI N OF IH 610
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 68 metric ton = 74.8 tons (Unknown [A])
Inventory: 40.8 metric ton = 44.9 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 34596 (2016) and Trucks: 7%
Future ADT: 45687 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider