Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 324.9 m = 1066.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 23
Skew: 0
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Montgomery County [339], Texas [48]
Owned by State Highway Agency [01], DOT District: 12
0.3 MI N OF FM 1485
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1972 (2019) and Trucks: 6%
Future ADT: 2330 (In 2033
)