Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 240.8 m = 790.1 ft
Main Spans: 4 at 36.6 m = 120.1 ft
Approach Spans: 5
Skew: 15
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Brazos County [041], Texas [48]
Owned by State Highway Agency [01], DOT District: 17
1.03 MI W OF FM 50
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 9774 (2019) and Trucks: 20%
Future ADT: 8830 (In 2033
)