HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


FRANKLIN AVE over BRAZOS RI #31 WAC (Route: 0)
Num:091610B02071001x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 174.3 m = 571.9 ft
Main Spans: 5 at 37.8 m = 124.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 16.5 m = 54.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 9
0.25 MI NE OF 3RD ST
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6700 (2016) and Trucks: 1%
Future ADT: 7440 (In 2036 )
ML KING JR BLVD over UP RR #52 WAC (Route: 17)
Num:091610B03185003x
Open: no restriction [A]
Built: 1974, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 107.6 m = 353.0 ft
Main Spans: 8 at 13.7 m = 44.9 ft
Approach Spans: 1
Skew: 99
Width, Roadway: 26.2 m = 86.0 ft (5 Lanes) and Out-To-Out: 29.5 m = 96.8 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 9
0.2 MI W OF IH 35
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8450 (2016) and Trucks: 0%
Future ADT: 10000 (In 2036 )
WASHINGTON AVE over BRAZOS RI #1 WAC (Route: 0)
Num:091610B00331001x
Open: no restriction [A]
Built: 1901, Reconstructed: 2010
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 171.9 m = 564.0 ft
Main Spans: 1 at 137.2 m = 450.2 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 6.6 m = 21.7 ft (2 Lanes) and Out-To-Out: 12.5 m = 41.0 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 4.27 m = 14.0 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 9
0.05 MI NE OF UNIV PARK
Condition
Deck: Very Good [8]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; field review indicates that failure of piers/abutments is imminent. [1]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3800 (2016) and Trucks: 0%
Future ADT: 4850 (In 2036 )
IH 35 SBFR over Brazos River (Route: 35)
Num:91610001501636x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 189 m = 620.1 ft
Main Spans: 1 at 76.2 m = 250.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by State Highway Agency [01], DOT District: 9
2.5 Mi N of LP 396
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 44.4 metric ton = 48.8 tons (Unknown [C])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [C])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 122200 (2013) and Trucks: 10%
Future ADT: 173500 (In 2033 )
IH 35 NB over BRAZOS RIVER (Route: 35)
Num:91610001501287x
New structure not yet open to traffic [G]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 182.9 m = 600.1 ft
Main Spans: 3 at 45.7 m = 149.9 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 18.8 m = 61.7 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by State Highway Agency [01], DOT District: 9
2.5 MI N OF US 77 BUS
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [B])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [B])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 52393 (2017) and Trucks: 22%
Future ADT: 75490 (In 2037 )
IH 35 NBFR over Brazos River (Route: 35)
Num:91610001501635x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Approach Span(s): Steel continuous [4] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 189 m = 620.1 ft
Main Spans: 1 at 76.2 m = 250.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by State Highway Agency [01], DOT District: 9
2.5 Mi N of LP 396
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 44.4 metric ton = 48.8 tons (Unknown [C])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [C])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 122200 (2013) and Trucks: 10%
Future ADT: 173500 (In 2033 )
UNIVERSITY PKS(WB) over BARRONS BRANCH #1008 WAC (Route: 6162)
Num:091610B06162002x
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 21.3 m = 69.9 ft
Main Spans: 1 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 9
0.15 MI NW WASHINGTON AVE
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 250 (2014) and Trucks: 1%
Future ADT: 350 (In 2036 )
IH 35 NB over FM 434 (Route: 35)
Num:91610001501289x
New structure not yet open to traffic [G]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 73.2 m = 240.2 ft
Main Spans: 4 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 15.4 m = 50.5 ft (4 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by State Highway Agency [01], DOT District: 9
4.5 Mi NE of SH 6
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [B])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [B])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 52393 (2017) and Trucks: 22%
Future ADT: 75490 (In 2037 )
UNIVERSITY PKS(EB) over BARRONS BRANCH #1007 WAC (Route: 6162)
Num:091610B06162001x
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 21.3 m = 69.9 ft
Main Spans: 1 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 9
0.15 MI NW WASHINGTON AVE
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 250 (2014) and Trucks: 1%
Future ADT: 350 (In 2036 )
IH 35 NB over MLK Blvd (Route: 35)
Num:91610001501285x
New structure not yet open to traffic [G]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 57.9 m = 190.0 ft
Main Spans: 4 at 16.8 m = 55.1 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 15.9 m = 52.2 ft (3 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Waco [76000]: McLennan County [309], Texas [48]
Owned by State Highway Agency [01], DOT District: 9
0.2 M N of Brazos River
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [B])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [B])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 1999 [199] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 52393 (2017) and Trucks: 31%
Future ADT: 150980 (In 2037 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider