Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 144.9 m = 475.4 ft
Main Spans: 14 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 7.2 m = 23.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Dona Ana County [013], New Mexico [35]
Owned by County Highway Agency [02], DOT District: 1
5.3 M N OF US-70/FAIRACRE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 37.6 metric ton = 41.4 tons (Load Factor(LF) [1])
Inventory: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3562 (2019) and Trucks: 3%
Future ADT: 5110 (In 2039
)