Bridge Type
Main Span(s): Steel [3] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 2 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 18 m = 59.1 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Richland Parish [083], Louisiana [22]
Owned by County Highway Agency [02], DOT District: 5
00.20 MI. N. OF US 80
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 97.2 metric ton = 106.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 78.1 metric ton = 85.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 234 (2016) and Trucks: 2%
Future ADT: 257 (In 2036
)