Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 43.3 m = 142.1 ft
Main Spans: 1 at 43.3 m = 142.1 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Columbus [19000]: Muscogee County [215], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
15 MI NE OF COLUMBUS
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 62.6 metric ton = 68.9 tons (Allowable Stress(AS) [2])
Inventory: 31.8 metric ton = 35.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8930 (2011) and Trucks: 16%
Future ADT: 13395 (In 2031
)