HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


BERNARDOD\POMERADO over INTERSTATE 15 W/HOV (Route: 0)
Num: 57 1129x
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Mixed types [20]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 117.4 m = 385.2 ft
Main Spans: 3 at 46 m = 150.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 16.7 m = 54.8 ft (4 Lanes) and Out-To-Out: 21 m = 68.9 ft for a 16.7 m = 54.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: San Diego County [073], California [06]
Owned by State Highway Agency [01], DOT District: 11
11-SD-015-M26.03
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2500 (2010) and Trucks: 1%
Future ADT: 5221 (In 2041 )
INTERSTATE 15 SB over LAKE HODGES (Route: 15)
Num: 57 1134Lx
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 212.7 m = 697.9 ft
Main Spans: 5 at 45 m = 147.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 24 m = 78.7 ft (5 Lanes) and Out-To-Out: 25 m = 82.0 ft for a 24 m = 78.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Diego [66000]: San Diego County [073], California [06]
Owned by State Highway Agency [01], DOT District: 11
11-SD-015-M26.20-SD
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 111500 (2009) and Trucks: 6%
Future ADT: 169726 (In 2042 )
INTERSTATE 15 NB over LAKE HODGES (Route: 15)
Num: 57 1134Rx
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 215.7 m = 707.7 ft
Main Spans: 5 at 45.8 m = 150.3 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 46.8 m = 153.6 ft (9 Lanes) and Out-To-Out: 48.4 m = 158.8 ft for a 46.8 m = 153.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
San Diego [66000]: San Diego County [073], California [06]
Owned by State Highway Agency [01], DOT District: 11
11-SD-015-M26.20-SD
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 105000 (2009) and Trucks: 6%
Future ADT: 188374 (In 2042 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider