HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


SIXTH STREET over SR 155-CS 792-NOR.SOU RR (Route: 2517)
Num:25550600x
Open: no restriction [A]
Built: 2012, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 95.1 m = 312.0 ft
Main Spans: 3 at 37.2 m = 122.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 5.13 m = 16.8 ft and Navigational Clearance: 0 = N/A
Location
Griffin [35324]: Spalding County [255], Georgia [13]
Owned by City or Municipal Highway Agency [04], DOT District: 3
IN GRIFFIN
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 62.6 metric ton = 68.9 tons (Load Factor(LF) [1])
Inventory: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4480 (2009) and Trucks: 1%
Future ADT: 4890 (In 2031 )
SR 16 over NS RAILROAD (Route: 16)
Num:25500020x
Open: no restriction [A]
Built: 1928, Reconstructed: 1976
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 23.2 m = 76.1 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 20.7 m = 67.9 ft (4 Lanes) and Out-To-Out: 24.5 m = 80.4 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Griffin [35324]: Spalding County [255], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN GRIFFIN
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 64.4 metric ton = 70.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 23750 (2011) and Trucks: 1%
Future ADT: 35625 (In 2031 )
MERIWETHER STREET over NS RAILROAD (Route: 781)
Num:25550470x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 22.9 m = 75.1 ft
Main Spans: 3 at 8.8 m = 28.9 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 9.9 m = 32.5 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Griffin [35324]: Spalding County [255], Georgia [13]
Owned by City or Municipal Highway Agency [04], DOT District: 3
DOWNTOWN GRIFFIN
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 45.4 metric ton = 49.9 tons (Allowable Stress(AS) [2])
Inventory: 24.5 metric ton = 27.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6540 (2011) and Trucks: 1%
Future ADT: 9810 (In 2031 )
POPLAR STREET over NS RAILROAD (Route: 2519)
Num:25500250x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.1 m = 65.9 ft
Main Spans: 3 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.7 m = 48.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Griffin [35324]: Spalding County [255], Georgia [13]
Owned by County Highway Agency [02], DOT District: 3
IN GRIFFIN
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5430 (2011) and Trucks: 1%
Future ADT: 8145 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider