STATE ROUTE 76 WB over OLD RIV RD: SAN LUIS REY (Route: 76)
Num: 57 0957Lx
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 404.8 m = 1328.1 ft
Main Spans: 8 at 56.4 m = 185.0 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Escondido [22804]: San Diego County [073], California [06]
Owned by State Highway Agency [01], DOT District: 11
11-SD-076-R9.62-ESD
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 20500 (2015) and Trucks: 5%
Future ADT: 20540 (In 2040 )
STATE ROUTE 76 over OLD RIV RD: SAN LUIS REY (Route: 76)
Num: 57 1208Rx
Open: no restriction [A]
Built: 2011, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 526.4 m = 1727.1 ft
Main Spans: 9 at 59.5 m = 195.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.2 m = 43.3 ft (2 Lanes) and Out-To-Out: 14.1 m = 46.3 ft for a 13.2 m = 43.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: San Diego County [073], California [06]
Owned by State Highway Agency [01], DOT District: 11
11-SD-076-R9.62
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 42.1 metric ton = 46.3 tons (Unknown [F])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 20500 (2015) and Trucks: 5%
Future ADT: 20540 (In 2040 )
OLD RIVER RD over GOPHER CANYON CREEK (Route: 0)
Num: 57C0056x
Open: no restriction [A]
Built: 1915, Reconstructed: 1974
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: San Diego County [073], California [06]
Owned by County Highway Agency [02], DOT District: 11
0.1MI S/O GOPHER CYN RD
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 28.8 metric ton = 31.7 tons ()
Inventory: 17.2 metric ton = 18.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 1430 (2016) and Trucks: 1%
Future ADT: 3753 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.