Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Corrugated Steel [6] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 24.4 m = 80.1 ft
Main Spans: 1 at 24.4 m = 80.1 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 6 m = 19.7 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Talladega County [121], Alabama [01]
Owned by County Highway Agency [02], DOT District: 4
0.5 MI E CO RT 005
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 2.7 metric ton = 3.0 tons (Load Factor(LF) [1])
Inventory: 1.8 metric ton = 2.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 515 (2018) and Trucks: 1%
Future ADT: 672 (In 2038
)