Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 43.6 m = 143.1 ft
Main Spans: 1 at 18 m = 59.1 ft
Approach Spans: 2
Skew: 15
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Cooke County [097], Texas [48]
Owned by County Highway Agency [02], DOT District: 3
2.3 MI SE OF FM 1197
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 44.4 metric ton = 48.8 tons (Allowable Stress(AS) [2])
Inventory: 32.7 metric ton = 36.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 100 (2015) and Trucks: 0%
Future ADT: 130 (In 2027
)