Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 68.3 m = 224.1 ft
Main Spans: 4 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 9.3 m = 30.5 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Haralson County [143], Georgia [13]
Owned by County Highway Agency [02], DOT District: 6
2.4 MI NW OF TALLAPOOSA
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Serious [3]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Inventory: 19.1 metric ton = 21.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 490 (2012) and Trucks: 1%
Future ADT: 735 (In 2032
)