Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 66.1 m = 216.9 ft
Main Spans: 1 at 22.3 m = 73.2 ft
Approach Spans: 4
Skew: 99
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 12.5 m = 41.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Atlanta [04000]: Fulton County [121], Georgia [13]
Owned by City or Municipal Highway Agency [04], DOT District: 7
PIEDMONT PK RR717941E
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Inventory: 19.1 metric ton = 21.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2202 (2011) and Trucks: 1%
Future ADT: 3303 (In 2031
)