VALLEY BLVD over RIO HONDO (Route: 0)
Num: 53C0348x
Open: no restriction [A]
Built: 1956, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 74.1 m = 243.1 ft
Main Spans: 3 at 24.1 m = 79.1 ft
Approach Spans: 0
Skew: 39
Width, Roadway: 24.5 m = 80.4 ft (4 Lanes) and Out-To-Out: 29.4 m = 96.5 ft for a 23.2 m = 76.1 ft approaching roadway.
Vertical Clearance: 30.48 m = 100.0 ft and Navigational Clearance: 0 = N/A
Location
El Monte [22230]: Los Angeles County [037], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 7
300FT W/O SANTA ANITA AVE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 58.3 metric ton = 64.1 tons (Load Factor(LF) [1])
Inventory: 35 metric ton = 38.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 21186 (2012) and Trucks: 3%
Future ADT: 25423 (In 2038 )
E10 & W10 BUSWAYS over LAFC ACCESS ROAD (Route: 10)
Num: 53 2636x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 10.1 m = 33.1 ft
Main Spans: 1 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 61
Width, Roadway: 15.8 m = 51.8 ft (2 Lanes) and Out-To-Out: 16.6 m = 54.5 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
El Monte [22230]: Los Angeles County [037], California [06]
Owned by State Highway Agency [01], DOT District: 7
07-LA-010S-28.32-EMTE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.8 metric ton = 109.8 tons (Load Factor(LF) [1])
Inventory: 58 metric ton = 63.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 200 (2011) and Trucks: 0%
Future ADT: 300 (In 2036 )
W10 & E10 BUSWAYS over RIO HONDO RIVER (Route: 10)
Num: 53 2637x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 110.8 m = 363.5 ft
Main Spans: 3 at 36 m = 118.1 ft
Approach Spans: 0
Skew: 54
Width, Roadway: 13.6 m = 44.6 ft (2 Lanes) and Out-To-Out: 14.3 m = 46.9 ft for a 13.6 m = 44.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
El Monte [22230]: Los Angeles County [037], California [06]
Owned by State Highway Agency [01], DOT District: 7
07-LA-010S-28.33-EMTE
Condition
Deck: Poor [4]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 28.5 metric ton = 31.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22 metric ton = 24.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 500 (2011) and Trucks: 5%
Future ADT: 618 (In 2036 )