Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 72.2 m = 236.9 ft
Main Spans: 3 at 27.7 m = 90.9 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 24.3 m = 79.7 ft (2 Lanes) and Out-To-Out: 30 m = 98.4 ft for a 19 m = 62.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Highland [33588]: San Bernardino County [071], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 8
4.3 MI E CHURCH ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 42.1 metric ton = 46.3 tons (Unknown [F])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 6100 (2015) and Trucks: 1%
Future ADT: 7370 (In 2042
)