Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 358.4 m = 1175.9 ft
Main Spans: 6 at 79.2 m = 259.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.5 m = 37.7 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Gainesville [31908]: Hall County [139], Georgia [13]
Owned by State Highway Agency [01], DOT District: 1
IN NW GAINESVILLE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 23520 (2012) and Trucks: 1%
Future ADT: 35280 (In 2032
)