Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 54.9 m = 180.1 ft
Main Spans: 3 at 9.1 m = 29.9 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 5.4 m = 17.7 ft (2 Lanes) and Out-To-Out: 6.6 m = 21.7 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Madison County [089], Alabama [01]
Owned by County Highway Agency [02], DOT District: 1
1.4 MI S NEW HOPE
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design: M 9 / H 10 [1]
Operating: 14.5 metric ton = 16.0 tons (Load Factor(LF) [1])
Inventory: 8.7 metric ton = 9.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 672 (2002) and Trucks: 1%
Future ADT: 875 (In 2041
)