Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 18.9 m = 62.0 ft
Main Spans: 2 at 9.4 m = 30.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 5.49 m = 18.0 ft and Navigational Clearance: 0 = N/A
Location
Prescott [57380]: Yavapai County [025], Arizona [04]
Owned by City or Municipal Highway Agency [04], DOT District: 88
1 Block W of Montezuma St
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 13.6 metric ton = 15.0 tons ()
Inventory: 8.2 metric ton = 9.0 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1050 (2019) and Trucks: 5%
Future ADT: 1060 (In 2039
)