Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 2 at 10.1 m = 33.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 6.1 m = 20.0 ft and Navigational Clearance: 0 = N/A
Location
Prescott [57380]: Yavapai County [025], Arizona [04]
Owned by City or Municipal Highway Agency [04], DOT District: 88
0.1 mi West of SR 89
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 27.2 metric ton = 29.9 tons ()
Inventory: 16.3 metric ton = 17.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 7000 (2019) and Trucks: 10%
Future ADT: 7010 (In 2039
)