Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 175.2 m = 574.8 ft
Main Spans: 1 at 82.3 m = 270.0 ft
Approach Spans: 6
Skew: 50
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 4.75 m = 15.6 ft and Navigational Clearance: 0 = N/A
Location
Victorville [82590]: San Bernardino County [071], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 8
2.5 MI NORTH OF I-15
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 43.7 metric ton = 48.1 tons (Load Factor(LF) [1])
Inventory: 26.2 metric ton = 28.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Superior to present desirable criteria [9] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 9040 (2014) and Trucks: 7%
Future ADT: 8257 (In 2040
)