Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 791 m = 2595.3 ft
Main Spans: 1 at 109.7 m = 359.9 ft
Approach Spans: 13
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 17.4 m = 57.1 ft
Location
Decatur [20104]: Morgan County [103], Alabama [01]
Owned by State Highway Agency [01], DOT District: 2
0.1 M N JCT SR 3 & SR 20
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.7 metric ton = 55.8 tons (Load Factor(LF) [1])
Inventory: 33 metric ton = 36.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20045 (2020) and Trucks: 7%
Future ADT: 25749 (In 2033
)