Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 74.4 m = 244.1 ft
Main Spans: 3 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 60
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Comanche County [031], Oklahoma [40]
Owned by State Highway Agency [01], DOT District: 7
3.20 MI. E. KIOWA CL
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2550 (2019) and Trucks: 25%
Future ADT: 4080 (In 2039
)