FAP 3 over TODD CREEK (Route: 51)
Num: 79SR0030031x
Open: no restriction [A]
Built: 1933, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.8 m = 58.4 ft
Main Spans: 2 at 8.7 m = 28.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
.2 M S OF SR388
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 49.5 metric ton = 54.5 tons (Load Factor(LF) [1])
Inventory: 29.7 metric ton = 32.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 30520 (2019) and Trucks: 10%
Future ADT: 48832 (In 2040 )
FAP 3 over TODD CREEK (Route: 51)
Num: 79SR0030032x
Open: no restriction [A]
Built: 1956, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 2 at 8.7 m = 28.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.7 m = 31.8 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 9.7 m = 31.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
.2 M S OF SR 388
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 73.8 metric ton = 81.2 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 30520 (2019) and Trucks: 10%
Future ADT: 48832 (In 2040 )
FAP 3 over BRANCH (Route: 51)
Num: 79SR0030033x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 10.5 m = 34.5 ft
Main Spans: 2 at 4.3 m = 14.1 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 0 m = 0.0 ft (6 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 30.5 m = 100.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
SR-3 & SR-388 JCT
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 36 metric ton = 39.6 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 13.7 km = 8.5 mi
Traffic
ADT: 24650 (2019) and Trucks: 10%
Future ADT: 39440 (In 2040 )
FAU 5095 over TODD CREEK (Route: 5095)
Num: 790A0020001x
Open: no restriction [A]
Built: 1983, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 47.2 m = 154.9 ft
Main Spans: 3 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.2 m = 33.5 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by City or Municipal Highway Agency [04], DOT District: 4
MILLINGTON ST - MEMPHIS
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.1 metric ton = 48.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 2970 (2021) and Trucks: 2%
Future ADT: 4752 (In 2039 )
FAU 2806 297486B over CNIC RAILROAD (Route: 2806)
Num: 79K28060001x
Open: no restriction [A]
Built: 1953, Reconstructed: 1981
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 41.1 m = 134.8 ft
Main Spans: 5 at 11.3 m = 37.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16 m = 52.5 ft (4 Lanes) and Out-To-Out: 19.8 m = 65.0 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by City or Municipal Highway Agency [04], DOT District: 4
N WATKINS ST - MEMPHIS
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 36 metric ton = 39.6 tons ()
Inventory: 24.3 metric ton = 26.7 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11420 (2018) and Trucks: 6%
Future ADT: 18272 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.