Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 523.6 m = 1717.9 ft
Main Spans: 17 at 30.8 m = 101.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 34.1 m = 111.9 ft (4 Lanes) and Out-To-Out: 34.7 m = 113.9 ft for a 34.1 m = 111.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [01815]: McClain County [087], Oklahoma [40]
Owned by State Highway Agency [01], DOT District: 3
MC CLAIN&CLEVELAND CL
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.5 metric ton = 91.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 5.5 km = 3.4 mi
Traffic
ADT: 45900 (2019) and Trucks: 36%
Future ADT: 73440 (In 2039
)