HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


NFA 922 over HATCHEL CREEK (Route: 922)
Num: 84E00280001x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11.9 m = 39.0 ft
Main Spans: 1 at 11.9 m = 39.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.6 m = 28.2 ft (2 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tipton County [167], Tennessee [47]
Owned by County Highway Agency [02], DOT District: 4
.1 M JCT SR3
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.1 metric ton = 48.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4950 (2021) and Trucks: 12%
Future ADT: 7920 (In 2040 )
FAP 3 over FROG BRANCH (Route: 51)
Num: 84SR0030007x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 2 at 4.6 m = 15.1 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 20.4 m = 66.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tipton County [167], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
IN BRIGHTON
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 71.1 metric ton = 78.2 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 13.7 km = 8.5 mi
Traffic
ADT: 12790 (2019) and Trucks: 10%
Future ADT: 20464 (In 2040 )
FAP 3 over INDIAN CR DRAINAGE CANAL (Route: 51)
Num: 84SR0030010x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 3 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tipton County [167], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
.42 MI.NE.OF BRIGHTON
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.3 metric ton = 76.2 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12790 (2019) and Trucks: 10%
Future ADT: 20464 (In 2040 )
FAP 3 over INDIAN CR DRAINAGE CANAL (Route: 51)
Num: 84SR0030009x
Posted for load [P]
Built: 1924, Reconstructed: 1958
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 15.8 m = 51.8 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tipton County [167], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
.43 MI.NE.OF BRIGHTON
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 45 metric ton = 49.5 tons (Load Factor(LF) [1])
Inventory: 27 metric ton = 29.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12790 (2019) and Trucks: 10%
Future ADT: 20464 (In 2041 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider