Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 3 at 3.7 m = 12.1 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 0 m = 0.0 ft (6 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 23.2 m = 76.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Clark County [003], Nevada [32]
Owned by State Highway Agency [01], DOT District: 1
NORTH OF LAS VEGAS
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.3 metric ton = 61.9 tons (Load Factor(LF) [1])
Inventory: 33.7 metric ton = 37.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 24500 (2017) and Trucks: 25%
Future ADT: 50669 (In 2040
)