HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 9


MARY STREET over BEAVER CREEK (Route: 0)
Num:19987x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 15.5 m = 50.9 ft
Main Spans: 1 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7 m = 23.0 ft (2 Lanes) and Out-To-Out: 10.9 m = 35.8 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.06NORFK ST;0.06FAIRVW S
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 7432 (1994) and Trucks: 4%
Future ADT: 11148 (In 2034 )
WILLIAMS STREET over BEAVER CREEK (Route: 0)
Num:19986x
Open: no restriction [A]
Built: 1984, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.5 m = 41.0 ft
Main Spans: 1 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.4 m = 24.3 ft (2 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.1NORFK. AVE;0.13GOODS S
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 75.3 metric ton = 82.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 50.8 metric ton = 55.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1166 (1991) and Trucks: 1%
Future ADT: 1749 (In 2034 )
FAIRVIEW ST. over BEAVER CREEK (Route: 0)
Num:19974x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.01VER AVE; 0.40 MARY ST
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 2900 (2018) and Trucks: 4%
Future ADT: 4350 (In 2039 )
MARY STREET over NS RAILWAY (Route: 0)
Num:19972x
Posted for load [P]
Built: 1918, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 70.7 m = 232.0 ft
Main Spans: 5 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12 m = 39.4 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by Railroad [27], DOT District: 1
0.00 MLK BLVD; .05 WASH
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 10.9 metric ton = 12.0 tons (Load Factor(LF) [1])
Inventory: 6.4 metric ton = 7.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4300 (2018) and Trucks: 1%
Future ADT: 6450 (In 2039 )
GOODSON STREET over BEAVER CREEK (Route: 0)
Num:19971x
Posted for load [P]
Built: 1929, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 1 at 13.4 m = 44.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.05STATE ST; 0.18MARY ST
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design:
Operating: 20.9 metric ton = 23.0 tons (Load Factor(LF) [1])
Inventory: 11.8 metric ton = 13.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2500 (2018) and Trucks: 2%
Future ADT: 3750 (In 2039 )
VIRGINIA STREET over BEAVER CREEK (Route: 0)
Num:19994x
Open: no restriction [A]
Built: 1932, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.7 m = 44.9 ft
Main Spans: 1 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.12 ST ST 0.02 WILLMS ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Inventory: 19.1 metric ton = 21.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 886 (1994) and Trucks: 2%
Future ADT: 1329 (In 2034 )
WASHINGTON STREET over BEAVER CREEK (Route: 0)
Num:19993x
Open: no restriction [A]
Built: 1932, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11.9 m = 39.0 ft
Main Spans: 1 at 11.9 m = 39.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 10.9 m = 35.8 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.15 ST ST 0.06 WILLAMST
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Inventory: 20 metric ton = 22.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 999 (1994) and Trucks: 1%
Future ADT: 1499 (In 2034 )
COLUMBIA AVENUE over BEAVER CREEK (Route: 0)
Num:19988x
Open: no restriction [A]
Built: 1984, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 12.5 m = 41.0 ft
Main Spans: 1 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.15RANDAL ST;0.01MUMP DR
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 81.6 metric ton = 89.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 62.6 metric ton = 68.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2187 (1991) and Trucks: 0%
Future ADT: 3281 (In 2034 )
M.L.K. JR. BLVD. over BEAVER CREEK (Route: 0)
Num:20004x
Open: no restriction [A]
Built: 1930, Reconstructed: 1978
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 14.6 m = 47.9 ft
Main Spans: 1 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 25.9 m = 85.0 ft (4 Lanes) and Out-To-Out: 27.6 m = 90.6 ft for a 27.4 m = 89.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ambar [01600]: Bristol city [520], Virginia [51]
Owned by City or Municipal Highway Agency [04], DOT District: 1
.15STATE ST;0.05 SCOTT ST
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 6200 (2018) and Trucks: 2%
Future ADT: 9300 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider