HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


KY-1804 over CLEAR FORK (Route: 1804)
Num:118B00108Nx
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 92.4 m = 303.2 ft
Main Spans: 3 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Whitley County [235], Kentucky [21]
Owned by State Highway Agency [01], DOT District: 11
.15 MI SE JCT US 25W
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 99.8 metric ton = 109.8 tons (Load Factor(LF) [1])
Inventory: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 908 (2019) and Trucks: 5%
Future ADT: 908 (In 2039 )
I-75 over US 25W (Route: 75)
Num:118B00055Rx
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 65.2 m = 213.9 ft
Main Spans: 3 at 26.8 m = 87.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Whitley County [235], Kentucky [21]
Owned by State Highway Agency [01], DOT District: 11
NBL 3.2 MI N OF TENN ST L
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.8 metric ton = 76.8 tons (Load Factor(LF) [1])
Inventory: 41.8 metric ton = 46.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 15764 (2019) and Trucks: 31%
Future ADT: 19547 (In 2039 )
I-75 NC over US 25W (Route: 75)
Num:118B00055Lx
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 65.2 m = 213.9 ft
Main Spans: 3 at 26.8 m = 87.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Whitley County [235], Kentucky [21]
Owned by State Highway Agency [01], DOT District: 11
SBL 3.2 MI N OF TENN ST L
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.8 metric ton = 76.8 tons (Load Factor(LF) [1])
Inventory: 41.8 metric ton = 46.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 15764 (2019) and Trucks: 31%
Future ADT: 19547 (In 2039 )
Foley Bend Road over CSX Railroad (Route: 1259)
Num:118C00072Nx
Open: no restriction [A]
Built: 2020, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface:
Bridge Dimensions
Length: 27.4 m = 89.9 ft
Main Spans: 2 at 13.4 m = 44.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6 m = 19.7 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Whitley County [235], Kentucky [21]
Owned by County Highway Agency [02], DOT District: 11
0.01 MI East of CR-1260
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design:
Operating: 51.2 metric ton = 56.3 tons (Load Factor(LF) [1])
Inventory: 30.7 metric ton = 33.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 170 (2020) and Trucks: 6%
Future ADT: 207 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider