Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 48.2 m = 158.1 ft
Main Spans: 3 at 16 m = 52.5 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.2 m = 30.2 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hollister [32662]: Taney County [213], Missouri [29]
Owned by State Highway Agency [01], DOT District: 6
S 4 T 22 N R 21 W
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Inventory: 19.8 metric ton = 21.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 5.1 km = 3.2 mi
Traffic
ADT: 20582 (2019) and Trucks: 3%
Future ADT: 48367 (In 2039
)