Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 51.2 m = 168.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Scott County [169], Virginia [51]
Owned by State Highway Agency [01], DOT District: 1
0013T-833 0008T-837
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: HL93 [A]
Operating: 89.8 metric ton = 98.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 72.6 metric ton = 79.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 1356 (2018) and Trucks: 5%
Future ADT: 1800 (In 2035
)