Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 1 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Kay County [071], Oklahoma [40]
Owned by County Highway Agency [02], DOT District: 4
1S .7E PF US77/SH11E
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Serious [3]
Loading
Design:
Operating: 90.7 metric ton = 99.8 tons (Load Factor(LF) [1])
Inventory: 71.7 metric ton = 78.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 2020 [0320] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 250 (2019) and Trucks: 15%
Future ADT: 400 (In 2039
)