HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


IS 264 EBL over N&W RR; Holt St & HRT RR (Route: 264)
Num:20992x
Open: no restriction [A]
Built: 1972, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 257 m = 843.2 ft
Main Spans: 13 at 22.6 m = 74.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.9 m = 62.0 ft (4 Lanes) and Out-To-Out: 19.9 m = 65.3 ft for a 18.9 m = 62.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.56 MI FROM IS 464
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 89.8 metric ton = 98.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 46.3 metric ton = 50.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 46140 (2018) and Trucks: 6%
Future ADT: 103239 (In 2035 )
IS 264 over Park Ave (Route: 264)
Num:21013x
Open: no restriction [A]
Built: 1972, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 43.9 m = 144.0 ft
Main Spans: 3 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 40.1 m = 131.6 ft (9 Lanes) and Out-To-Out: 41.8 m = 137.1 ft for a 40.1 m = 131.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
.59 from 464/.33 to 166
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 44.5 metric ton = 49.0 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 33.7 metric ton = 37.1 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 91228 (2018) and Trucks: 6%
Future ADT: 57558 (In 2035 )
IS 264 WBL over NS RR; Holt St & HRT RR (Route: 264)
Num:21000x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 583.7 m = 1915.1 ft
Main Spans: 2 at 36 m = 118.1 ft
Approach Spans: 26
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 6.1 m = 20.0 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.37 MI FR INT IS 464 SBL
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 57.2 metric ton = 62.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 40.8 metric ton = 44.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 41344 (2018) and Trucks: 6%
Future ADT: 79800 (In 2034 )
IS 264 EBL Ramp over Holt St & Light Rail (Route: 264)
Num:20973x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 198.1 m = 650.0 ft
Main Spans: 10 at 22.9 m = 75.1 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 7.6 m = 24.9 ft (1 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.36 MI FR CITY HALL AVE.
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 93.9 metric ton = 103.3 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 70.8 metric ton = 77.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 46140 (2018) and Trucks: 6%
Future ADT: 3500 (In 2035 )
IS 264 WBL over SR 337 SBL Tidewater Dr (Route: 264)
Num:20975x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 184.1 m = 604.0 ft
Main Spans: 1 at 26.8 m = 87.9 ft
Approach Spans: 9
Skew: 35
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.26 MI FR INT IS 464 SBL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 67.1 metric ton = 73.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 49.9 metric ton = 54.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 41344 (2018) and Trucks: 6%
Future ADT: 49500 (In 2035 )
IS 264 over Claiborne Ave (Route: 264)
Num:21011x
Open: no restriction [A]
Built: 1972, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 43.9 m = 144.0 ft
Main Spans: 3 at 20.1 m = 65.9 ft
Approach Spans: 0
Skew: 29
Width, Roadway: 39.2 m = 128.6 ft (9 Lanes) and Out-To-Out: 42.1 m = 138.1 ft for a 39.2 m = 128.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.77 fr 464/0.15 to 166
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.2 metric ton = 61.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 43.5 metric ton = 47.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 91228 (2018) and Trucks: 6%
Future ADT: 57558 (In 2035 )
SR 337 NBL Ramp over Adj to Mainline Br 2858 (Route: 337)
Num:20774x
Open: no restriction [A]
Built: 1972, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 68.6 m = 225.1 ft
Main Spans: 4 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 19.5 m = 64.0 ft (3 Lanes) and Out-To-Out: 21.1 m = 69.2 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
Ramp to Tidewater Drive
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 45.4 metric ton = 49.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 31.8 metric ton = 35.0 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 12015 (2018) and Trucks: 4%
Future ADT: 7000 (In 2035 )
IS 264 WBL over City Hall Ave (Route: 264)
Num:20979x
Open: no restriction [A]
Built: 1991, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 281 m = 922.0 ft
Main Spans: 5 at 32.9 m = 107.9 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.60 MI FR INT IS 464 SBL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 51 metric ton = 56.1 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 39.6 metric ton = 43.6 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 13516 (2018) and Trucks: 2%
Future ADT: 50131 (In 2035 )
IS 264 WBL Ramp over Ditch (Route: 264)
Num:20977x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 94.5 m = 310.1 ft
Main Spans: 5 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.8 m = 22.3 ft (1 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 12.3 m = 40.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
0.25 MI TO ST. PAULS BLVD
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 92.5 metric ton = 101.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 52.6 metric ton = 57.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 46140 (2018) and Trucks: 6%
Future ADT: 14700 (In 2035 )
IS 264 WBL Ramp E over Adj to Mainline Br 2806 (Route: 264)
Num:20978x
Open: no restriction [A]
Built: 1991, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 49.4 m = 162.1 ft
Main Spans: 2 at 25 m = 82.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (1 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [08750]: Norfolk city [710], Virginia [51]
Owned by State Highway Agency [01], DOT District: 5
DOWNTOWN TUNNEL INTER.
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 87.1 metric ton = 95.8 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 67.1 metric ton = 73.8 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 9140 (2014) and Trucks: 3%
Future ADT: 3500 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider