HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


WEST CLIFF DRIVE over RAILROAD AND VIADUCT LN (Route: 0)
Num: 36C0127x
Open: no restriction [A]
Built: 2001, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Wood or timber [7] Stringer/Multi-beam or girder [02]
Deck: Corrugated Steel [6] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 56.5 m = 185.4 ft
Main Spans: 1 at 18.9 m = 62.0 ft
Approach Spans: 8
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (1 Lanes) and Out-To-Out: 6.3 m = 20.7 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Santa Cruz [69112]: Santa Cruz County [087], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 5
WEST CLIFF AND BEACH ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.1 metric ton = 46.3 tons (Allowable Stress(AS) [2])
Inventory: 28.2 metric ton = 31.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5000 (2014) and Trucks: 5%
Future ADT: 5500 (In 2037 )
LAUREL ST over SAN LORENZO RIVER (Route: 0)
Num: 36C0102x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 102.2 m = 335.3 ft
Main Spans: 1 at 51.8 m = 170.0 ft
Approach Spans: 2
Skew: 25
Width, Roadway: 21.3 m = 69.9 ft (5 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Santa Cruz [69112]: Santa Cruz County [087], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 5
0.8 MI E OF S.R. I
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 88.8 metric ton = 97.7 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 18604 (2013) and Trucks: 10%
Future ADT: 24387 (In 2041 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider