HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


SOQUEL DR over APTOS CREEK (Route: 0)
Num: 36C0075x
Open: no restriction [A]
Built: 1928, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 76 m = 249.4 ft
Main Spans: 1 at 41.1 m = 134.8 ft
Approach Spans: 10
Skew: 99
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Santa Cruz County [087], California [06]
Owned by County Highway Agency [02], DOT District: 5
AT SPRECKLES DR
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 36 metric ton = 39.6 tons (Load Factor(LF) [1])
Inventory: 21.7 metric ton = 23.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 14600 (2016) and Trucks: 10%
Future ADT: 15915 (In 2041 )
STATE ROUTE 1 over APTOS CRK & SPRECKELS DR (Route: 1)
Num: 36 0011x
Open: no restriction [A]
Built: 1948, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 79.2 m = 259.9 ft
Main Spans: 5 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.8 m = 55.1 ft (4 Lanes) and Out-To-Out: 18.5 m = 60.7 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Santa Cruz County [087], California [06]
Owned by State Highway Agency [01], DOT District: 5
05-SCR-001-10.01
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 30.8 metric ton = 33.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 78000 (2019) and Trucks: 3%
Future ADT: 128534 (In 2037 )
SPRECKLES DR over APTOS CREEK (Route: 0)
Num: 36C0113x
Open: no restriction [A]
Built: 1937, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 13.1 m = 43.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.5 m = 24.6 ft (2 Lanes) and Out-To-Out: 9 m = 29.5 ft for a 7.8 m = 25.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Santa Cruz County [087], California [06]
Owned by County Highway Agency [02], DOT District: 5
TREASURE ISLAND DR
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 55.4 metric ton = 60.9 tons (Load Factor(LF) [1])
Inventory: 33.4 metric ton = 36.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 6730 (2015) and Trucks: 10%
Future ADT: 10202 (In 2041 )
STATE PARK DRIVE over STATE ROUTE 1 (Route: 0)
Num: 36 0028x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 64.6 m = 212.0 ft
Main Spans: 2 at 21.9 m = 71.9 ft
Approach Spans: 2
Skew: 3
Width, Roadway: 9.7 m = 31.8 ft (2 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 9.7 m = 31.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Santa Cruz County [087], California [06]
Owned by State Highway Agency [01], DOT District: 5
05-SCR-001-10.54
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36.6 metric ton = 40.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 26.9 metric ton = 29.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 16200 (2019) and Trucks: 1%
Future ADT: 26721 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.