Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 12.6 m = 41.3 ft
Main Spans: 3 at 4.5 m = 14.8 ft
Approach Spans: 0
Skew: 23
Width, Roadway: 0 m = 0.0 ft (3 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 30.18 m = 99.0 ft and Navigational Clearance: 0 = N/A
Location
Washington [81960]: Washington County [053], Utah [49]
Owned by City or Municipal Highway Agency [04], DOT District: 4
300 EAST INDUSTRIAL ROAD
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 10.7 metric ton = 11.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 9.4 metric ton = 10.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 7100 (2017) and Trucks: 10%
Future ADT: 8875 (In 2037
)