Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface:
Bridge Dimensions
Length: 11.8 m = 38.7 ft
Main Spans: 1 at 10.9 m = 35.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (1 Lanes) and Out-To-Out: 4.9 m = 16.1 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Massac County [127], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 9
2.5 MI E OF US 45
Condition
Deck: Very Good [8]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 30.8 metric ton = 33.9 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Inventory: 21.7 metric ton = 23.9 tons (Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading [7])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 75 (2020) and Trucks: 13%
Future ADT: 66 (In 2032
)